SUS410S Weak Corrosion Resistant Ferritic Stainless Steel Coil

SUS410S Weak Corrosion Resistant Ferritic Stainless Steel Coil

SUS410S Weak Corrosion Resistant Ferritic Stainless Steel Coil

specification
0.5*1219*C
0.9*1219*C
2.5*1219*C
12.0*1500*C
8.0*1500*C
0.6*1219*C
1.0*1219*C
3.0*1219*C
16.0*1500*C
20.0*1500*C
0.7*1219*C
1.5*1219*C
5.0*1500*C
6.0*1500*C
0.8*1219*C
2.0*1219*C
4.0*1500*C
10.0*1500*C

Product Specifications

Major categories of stainless steel National standard grades American Standard numbers (ASTM/UNS) Japanese Code (JIS) European marking number (EN/ material number) Application scenarios
Austenitic stainless steel 06Cr19Ni10 304/S30400 SUS304 10/1.4301 X5CrNi18 - Kitchenware and tableware, hardware fittings, Architectural decoration, fluid fittings, General mechanical equipment, Daily five Metalwork
Austenitic stainless steel 022Cr19Ni10 304L/S30403 SUS304L 9/1.4306 X2CrNi18 - Chemical containers, welded pipe fittings, Food and pharmaceutical equipment, large steel Structures, low-temperature components
Austenitic stainless steel 06Cr17Ni12Mo2 316/S31600 SUS316 X5CrNiMo17-12-2/1. Ship fittings, Marine equipment, Chemical piping, pumps and valves, coastal Construction, food and pharmaceutical equipment
Austenitic stainless steel 022Cr17Ni12Mo2 316L/S31603 SUS316L X2CrNiMo17-12-2/1. Deep-sea equipment, chemical reactions Kettles, high-end food equipment, sea Water desalination components
Austenitic stainless steel 06Cr18Ni11Ti 321/S32100 SUS321 10/1.4541 X6CrNiTi18 - High-temperature piping, boiler fittings, Heat treatment equipment, aerospace Structural components
Austenitic stainless steel 06Cr25Ni20 310S/S31008 SUS310S 20/1.4845 X15CrNiSi25 - Industrial furnace bodies, kiln fittings, High-temperature heating pipes, heat treatment Tooling
Austenitic stainless steel 06Cr25Ni20Si2 314/S31400 SUS314 21/1.4841 X15CrNiSi25 - Industrial heat treatment furnaces, high-temperature POTS Furnace pipes, kiln linings, high Heating equipment fittings for high temperatures
Austenitic stainless steel 022Cr18Ni16Mo5 S31792 SUS31792 X2CrNiMo18-16-5/1. High-temperature chemical fluid piping, along Offshore high-temperature equipment, desulfurization and denitrification Equipment components
Austenitic stainless steel 06Cr21Ni5Mo2N S20910 SUS20910 X2CrNiMoN21-5-2/1. High-temperature pressure vessels, heat exchangers Apparatus, chemical high-temperature structural components, High-temperature ship fittings
Austenitic stainless steel 022Cr19Ni13Mo4 904L/S38904 SUS904L X1NiCrMoCu25-20-5/ Chemical desulfurization equipment, pharmaceutical equipment Equipment, high-end corrosion-resistant precision parts Parts, seawater treatment equipment
Austenitic stainless steel 020Cr18Ni20Mo6CuN 254Mo/S31254 SUS254Mo X1CrNiMoCuN20-18-7 Desalination equipment, deep-sea vessels Ship piping, chemical strong acid equipment Equipment, high-end seawater treatment components
Austenitic stainless steel 015Cr21Ni26Mo5Cu2 N08367 SUSN08367 X1CrNiMoCu21-26-5/ Deep-sea oil and gas equipment, chemical distillation Towers, high-salt wastewater treatment, nuclear engineering Corrosion-resistant components for the industry
Austenitic stainless steel 020 cr20ni25mo4. 5 cu Incoloy926/N08926 SUS926 X1CrNiMoCu20-25-5/ Flue gas desulfurization equipment, chemical mixing Medium piping, pharmaceutical fermentation equipment Equipment, high-end components for Marine engineering
Austenitic stainless steel 06Cr18Ni9Cu3 304Cu/S30430 SUS304Cu 9/1.4567 X5CrNiCu18 - Precision hardware, electronic accessories, I Bath parts, small stamping parts
Austenitic stainless steel 06Cr19Ni13Mo3 317L/S31703 SUS317L X2CrNiMo18-15-4/1. Chemical distillation equipment, seawater desalination Piping for chemical and acidic fluids
Ferritic stainless steel 10Cr17 430/S43000 SUS430 X6Cr17/1.4016 Home appliance casings, interior decoration, virtual Sanitary hardware, car interiors, daily-use Hardware
Ferritic stainless steel 022Cr12 409L/S40903 SUS409L X2CrTi12/1.4512 Car exhaust pipes, household kitchenware, Common decorative panels
Ferritic stainless steel 10Cr17Mo 434/S43400 SUS434 X6CrMo17/1.4113 Bathroom fixtures, car trims, Outdoor decorative components
Ferritic stainless steel 019Cr18MoTi 444/S44400 SUS444 2/1.4521 X2CrMoTi18 - Solar energy equipment, water purification equipment Equipment, coastal civil decoration, sanitation Bath components, water heater inner tanks
Ferritic stainless steel 10Cr15 439/S43900 SUS439 X3CrTi17/1.4511 Kitchenware inner liner, home appliance panel, Small containers
Ferritic stainless steel 022Cr19Ti 441/S44100 SUS441 X2CrTi18/1.4509 Kitchen appliances, heating components, Outdoor decoration
Ferritic stainless steel 10Cr13 410S/S41008 SUS410S X6Cr13/1.4000 Mechanical parts, civilian hardware, Decorative strips
Ferritic stainless steel 019Cr24Mo4Ti 446/S44600 SUS446 X2CrMo25-5-1/1.4597 Industrial chimneys, outdoor high-temperature resistant Corrosion components, outside of chemical equipment Shells, large coastal decorative pieces
Ferritic stainless steel 022Cr21Mo3Ti 445/S44500 SUS445 3/1.4591 X2CrMoTi21 - High-end kitchen and bathroom, water purification equipment, Coastal civilian hardware, decorative surfaces plate
Ferritic stainless steel 022Cr26Mo1Ti 447/S44700 SUS447 1/1.4592 X2CrMo26 - Coastal construction, industrial anti-corrosion equipment Equipment, long-term outdoor corrosion-resistant structures a
Martensitic stainless steel 12Cr13 410/S41000 SUS410 X12Cr13/1.4006 Valves, shafts, fasteners, Tool fittings, mechanical wear parts
Martensitic stainless steel 20Cr13 420/S42000 SUS420 X20Cr13/1.4021 Precision cutting tools, medical cutting tools, Valve cores, wear-resistant tools
Martensitic stainless steel 30Cr13 420J2/S42020 SUS420J2 X30Cr13/1.4028 Industrial tools, bearings, wear-resistant Mechanical parts, mold fittings
Martensitic stainless steel 9Cr18 440C/S44004 SUS440C X105CrMo17/1.4125 High-end bearings, precision tools, Measuring tools, wear-resistant molds, medical Surgical knives
Martensitic stainless steel 11Cr17 440B/S44003 SUS440B X90CrMo18/1.4112 Industrial bearings, wear-resistant cutting tools, Mechanical molds, valve fittings, Precision wear-resistant parts
Martensitic stainless steel 14Cr17Ni2 431/S43100 SUS431 2/1.4057 X17CrNi16 - Pump shaft, valve stem, gear, Precision mechanical parts, Ocean Five gold
Martensitic stainless steel 17Cr16Ni2 440A/S44002 SUS440A X70CrMo15/1.4109 High-end cutting tools, bearings, measuring Tools, wear-resistant molds
Martensitic stainless steel 06Cr17 416/S41600 SUS416 X12CrS13/1.4005 Precision screws, instrument fittings, Electronic hardware, automatic turning parts
Duplex stainless steel austenitic + iron Plain duplex structure 022Cr22Ni5Mo3N 2205/S32205 SUS329J3L X2CrNiMoN22-5-3/1. Oil and gas equipment, chemical pressure capacity Vessels, seawater pipelines, deep-sea engineering cheng
Duplex stainless steel austenitic + iron Plain duplex structure 022Cr25Ni7Mo4N 2507/S32750 SUS329J5L X2CrNiMoN25-7-4/1. Deep sea oil and gas, chemical desulfurization, Seawater desalination, highly corrosive chemicals Equipment, offshore platform components
Duplex stainless steel austenitic + ferritic Bulk duplex structure 022Cr26Ni7Mo4CuN S32760 SUSS32760 X2CrNiMoCuN25-7-4/ Deep-sea vessel piping, Marine oil Gas extraction, seawater lift pump, Highly corrosive chemical pipelines
Duplex stainless steel austenitic + ferritic Bulk duplex structure 022Cr19Ni5Mo3Si2N 2304/S32304 SUS2304 X2CrNiMoN19-5-3/1 Chemical piping, water treatment equipment Equipment, general Marine engineering components
Duplex stainless steel austenitic + ferritic Bulk duplex structure 022Cr25Ni6Mo2N 2101/S32101 SUS2101 X2CrNiN21-1-2/1.4162 Building structures, bridge fittings, General chemical equipment
Duplex stainless steel austenitic + ferritic Bulk duplex structure 022Cr27Ni5Mo4N 2707/S32707 SUS2707 X2CrNiMoN27-5-4/1. Deep sea drilling, high-end chemicals, Corrosion-resistant components for the nuclear industry
Precipitation-hardening stainless steel 04Cr17Ni7Al 17-4PH/S17400 SUS630 X5CrNiCuNb17-4/1. Aerospace accessories, precision instruments Watches, valves, shafts, high-end Mechanical parts
Precipitation-hardening stainless steel 06Cr17Ni4Cu4Nb 17-4PH low-carbon improvement Item /S17401 SUS630L X4CrNiCuNb17-4/1. Welded precision structural components, chemical Welding containers, aviation welding Accessories
Precipitation hardening stainless steel 07Cr17Ni7Al 17-7PH/S17700 SUS631 7/1.4568 X7CrNiAl17 - Aviation springs, precision sensing Instruments, instrument elastic elements, high End fasteners
Precipitation-hardening stainless steel 05Cr13Ni8Mo2Al 13-8Mo/S13800 SUS138Mo X5CrNiMoAl13-8-2/1 Aeroengine core components, Deep-sea precision equipment, high-end medical Medical implant devices
Precipitation hardening stainless steel 06Cr17Ni10Mo2Al PH15-7Mo/S15700 SUS632 X7CrNiMoAl15-7-2/1 Chemical precision pumps and valves, Marine equipment Equipped with corrosion-resistant fittings, aviation precision Precision instruments
Precipitation-hardening stainless steel 04Cr12Ni5Cu3Mo Custom 450/S45000 SUS450 X4CrNiCuMo12-5-3/ Coastal precision hardware, chemical equipment Spare parts, pump and valve cores, high End medical devices
Precipitation hardening stainless steel 05Cr17Ni6Cu2Al 17-6PH/S17600 SUS635 X6CrNiCuAl17-6-2/1. Precision elastic components, aviation instruments Watch stands, high-end fasteners, Medical precision tools
Precipitation hardening stainless steel 04Cr¹9Ni9Mo3Al PH14-8Mo/S14800 SUS148Mo X4CrNiMoAl14-8-3/1 High-end chemical corrosion-resistant equipment, Marine deep water pipe fittings, navigation Special structural components for aerospace
Austenitic stainless steel 015Cr21Ni26Mo5Cu2 N08367 SUSN08367 X1CrNiMoCu21-26-5/ Deep-sea oil and gas equipment, chemical distillation Towers, high-salt wastewater treatment, nuclear engineering Corrosion-resistant components for the industry
Austenitic stainless steel 020 cr20ni25mo4. 5 cu Incoloy926/N08926 SUS926 X1CrNiMoCu20-25-5/ Flue gas desulfurization equipment, chemical mixing Medium piping, pharmaceutical fermentation equipment Equipment, high-end components for Marine engineering
Austenitic stainless steel 06Cr18Ni9Cu3 304Cu/S30430 SUS304Cu 9/1.4567 X5CrNiCu18 - Precision hardware, electronic accessories, I Bath parts, small stamping parts
Austenitic stainless steel 06Cr19Ni13Mo3 317L/S31703 SUS317L X2CrNiMo18-15-4/1. Chemical distillation equipment, seawater desalination Piping for chemical and acidic fluids
Ferritic stainless steel 10Cr17 430/S43000 SUS430 X6Cr17/1.4016 Home appliance casings, interior decoration, virtual Sanitary hardware, car interiors, daily-use Hardware
Ferritic stainless steel 022Cr12 409L/S40903 SUS409L X2CrTi12/1.4512 Car exhaust pipes, household kitchenware, Common decorative panels
Ferritic stainless steel 10Cr17Mo 434/S43400 SUS434 X6CrMo17/1.4113 Bathroom fixtures, car trims, Outdoor decorative components
Ferritic stainless steel 019Cr18MoTi 444/S44400 SUS444 2/1.4521 X2CrMoTi18 - Solar energy equipment, water purification equipment Equipment, coastal civil decoration, sanitation Bath components, water heater inner tanks
Ferritic stainless steel 10Cr15 439/S43900 SUS439 X3CrTi17/1.4511 Kitchenware inner liner, home appliance panel, Small containers
Ferritic stainless steel 022Cr19Ti 441/S44100 SUS441 X2CrTi18/1.4509 Kitchen appliances, heating components, Outdoor decoration
Ferritic stainless steel 10Cr13 410S/S41008 SUS410S X6Cr13/1.4000 Mechanical parts, civilian hardware, Decorative strips
Ferritic stainless steel 019Cr24Mo4Ti 446/S44600 SUS446 X2CrMo25-5-1/1.4597 Industrial chimneys, outdoor high-temperature resistant Corrosion components, outside of chemical equipment Shells, large coastal decorative pieces
Ferritic stainless steel 022Cr21Mo3Ti 445/S44500 SUS445 3/1.4591 X2CrMoTi21 - High-end kitchen and bathroom, water purification equipment, Coastal civilian hardware, decorative surfaces plate
Ferritic stainless steel 022Cr26Mo1Ti 447/S44700 SUS447 1/1.4592 X2CrMo26 - Coastal construction, industrial anti-corrosion equipment Equipment, long-term outdoor corrosion-resistant structures a
Martensitic stainless steel 12Cr13 410/S41000 SUS410 X12Cr13/1.4006 Valves, shafts, fasteners, Tool fittings, mechanical wear parts
Martensitic stainless steel 20Cr13 420/S42000 SUS420 X20Cr13/1.4021 Precision cutting tools, medical cutting tools, Valve cores, wear-resistant tools
Martensitic stainless steel 30Cr13 420J2/S42020 SUS420J2 X30Cr13/1.4028 Industrial tools, bearings, wear-resistant Mechanical parts, mold fittings
Martensitic stainless steel 9Cr18 440C/S44004 SUS440C X105CrMo17/1.4125 High-end bearings, precision tools, Measuring tools, wear-resistant molds, medical Surgical knives
Martensitic stainless steel 11Cr17 440B/S44003 SUS440B X90CrMo18/1.4112 Industrial bearings, wear-resistant cutting tools, Mechanical molds, valve fittings, Precision wear-resistant parts
Martensitic stainless steel 14Cr17Ni2 431/S43100 SUS431 2/1.4057 X17CrNi16 - Pump shaft, valve stem, gear, Precision mechanical parts, Ocean Five gold
Martensitic stainless steel 17Cr16Ni2 440A/S44002 SUS440A X70CrMo15/1.4109 High-end cutting tools, bearings, measuring Tools, wear-resistant molds
Martensitic stainless steel 06Cr17 416/S41600 SUS416 X12CrS13/1.4005 Precision screws, instrument fittings, Electronic hardware, automatic turning parts
Duplex stainless steel austenitic + iron Plain duplex structure 022Cr22Ni5Mo3N 2205/S32205 SUS329J3L X2CrNiMoN22-5-3/1. Oil and gas equipment, chemical pressure capacity Vessels, seawater pipelines, deep-sea engineering cheng
Duplex stainless steel austenitic + iron Plain duplex structure 022Cr25Ni7Mo4N 2507/S32750 SUS329J5L X2CrNiMoN25-7-4/1. Deep sea oil and gas, chemical desulfurization, Seawater desalination, highly corrosive chemicals Equipment, offshore platform components
Duplex stainless steel austenitic + ferritic Bulk duplex structure 022Cr26Ni7Mo4CuN S32760 SUSS32760 X2CrNiMoCuN25-7-4/ Deep-sea vessel piping, Marine oil Gas extraction, seawater lift pump, Highly corrosive chemical pipelines
Duplex stainless steel austenitic + ferritic Bulk duplex structure 022Cr19Ni5Mo3Si2N 2304/S32304 SUS2304 X2CrNiMoN19-5-3/1 Chemical piping, water treatment equipment Equipment, general Marine engineering components
Duplex stainless steel austenitic + ferritic Bulk duplex structure 022Cr25Ni6Mo2N 2101/S32101 SUS2101 X2CrNiN21-1-2/1.4162 Building structures, bridge fittings, General chemical equipment
Duplex stainless steel austenitic + ferritic Bulk duplex structure 022Cr27Ni5Mo4N 2707/S32707 SUS2707 X2CrNiMoN27-5-4/1. Deep sea drilling, high-end chemicals, Corrosion-resistant components for the nuclear industry
Precipitation-hardening stainless steel 04Cr17Ni7Al 17-4PH/S17400 SUS630 X5CrNiCuNb17-4/1. Aerospace accessories, precision instruments Watches, valves, shafts, high-end Mechanical parts
Precipitation-hardening stainless steel 06Cr17Ni4Cu4Nb 17-4PH low-carbon improvement Item /S17401 SUS630L X4CrNiCuNb17-4/1. Welded precision structural components, chemical Welding containers, aviation welding Accessories
Precipitation hardening stainless steel 07Cr17Ni7Al 17-7PH/S17700 SUS631 7/1.4568 X7CrNiAl17 - Aviation springs, precision sensing Instruments, instrument elastic elements, high End fasteners
Precipitation-hardening stainless steel 05Cr13Ni8Mo2Al 13-8Mo/S13800 SUS138Mo X5CrNiMoAl13-8-2/1 Aeroengine core components, Deep-sea precision equipment, high-end medical Medical implant devices
Precipitation hardening stainless steel 06Cr17Ni10Mo2Al PH15-7Mo/S15700 SUS632 X7CrNiMoAl15-7-2/1 Chemical precision pumps and valves, Marine equipment Equipped with corrosion-resistant fittings, aviation precision Precision instruments
Precipitation-hardening stainless steel 04Cr12Ni5Cu3Mo Custom 450/S45000 SUS450 X4CrNiCuMo12-5-3/ Coastal precision hardware, chemical equipment Spare parts, pump and valve cores, high End medical devices
Precipitation hardening stainless steel 05Cr17Ni6Cu2Al 17-6PH/S17600 SUS635 X6CrNiCuAl17-6-2/1. Precision elastic components, aviation instruments Watch stands, high-end fasteners, Medical precision tools
Precipitation hardening stainless steel 04Cr¹9Ni9Mo3Al PH14-8Mo/S14800 SUS148Mo X4CrNiMoAl14-8-3/1 High-end chemical corrosion-resistant equipment, Marine deep water pipe fittings, navigation Special structural components for aerospace